EPCC of LPG (Thai‐specification) project

Duration: April 2019 - December 2019
Owner: Trans Thai-Malaysia (Thailand) Limited
Location: Trans Thai‐Malaysia Songkhla

This slideshow requires JavaScript.

Power Plant Demolition

Duration: December 2017 – May 2018
Owner: The Bangchak Petroleum Public Company Limited
Location: BCP Bangna, BKK

This slideshow requires JavaScript.

Road Trench Design

Duration: July 2016 – September 2016
Owner: The Bangchak Petroleum Public Company Limited
Location: BCP Bangna, BKK

This slideshow requires JavaScript.

Pipe System Repair

Duration: May 2016 – September 2016
Owner: The Bangchak Petroleum Public Company Limited
Location: BCP Bangna, BKK

This slideshow requires JavaScript.

HP Steam to Spray Ring Pipe Reconstruction

Duration: January 2016 – March 2016
Owner: The Bangchak Petroleum Public Company Limited
Location: BCP Bangna, BKK

This slideshow requires JavaScript.

Pipe System Enhancement

Duration: May 2014 – November 2014
Owner: The Bangchak Petroleum Public Company Limited
Location: BCP Bangna, BKK

This slideshow requires JavaScript.

Sour Water Acid Gas Pipe Installation

Duration: May 2014 – November 2014
Owner: The Bangchak Petroleum Public Company Limited
Location: BCP Bangna, BKK


Maintenance

This slideshow requires JavaScript.

Replace tank T‐997B

Duration: August 2019 - March 2020
Owner: The Bangchak Petroleum Public Company Limited
Location: Bangchak BKK

This slideshow requires JavaScript.

Removable Insulation Repair and Installation

Duration: April 2017 – April 2019
Owner: The Bangchak Petroleum Public Company Limited
Location: BCP Bangna, BKK

This slideshow requires JavaScript.

Superheater, Reheater, Economizer Pipe Reconstruction

Duration: February 2017
Owner: Electricity Generating Authority of Thailand
Location: EGAT - RGC, Ratchaburi

This slideshow requires JavaScript.

Cold Reheat Pipe Reconstruction

Duration: February 2017
Owner: Electricity Generating Authority of Thailand
Location: EGAT - RGC, Ratchaburi

This slideshow requires JavaScript.

Storm Water Tank Repair

Duration: August 2016 –November 2016
Owner: The Bangchak Petroleum Public Company Limited
Location: BCP Bangna, BKK

This slideshow requires JavaScript.

Water Wall Pipe Reconstruction

Duration: May 2016 – July 2016
Owner: Electricity Generating Authority of Thailand
Location: EGAT - MAE MOH, Lampang

This slideshow requires JavaScript.

Piping and Power Plant Maintenance

Duration: February 2016 – March 2016
Owner: The Bangchak Petroleum Public Company Limited
Location: BCP Bangna, BKK

This slideshow requires JavaScript.

Water Tank Repair and Platform Installation

Duration: October 2015 – December 2016
Owner: The Bangchak Petroleum Public Company Limited
Location: BCP Bangna, BKK

This slideshow requires JavaScript.

HP Feed Water Heater Reconstruction

Duration: January 2011 – February 2011
Owner: Electricity Generating Authority of Thailand
Location: EGAT - Bang Pa Kong, Chachoengsao


Civil Work

This slideshow requires JavaScript.

Manhole & Duct Bank for MEA Chidlom Terminal Station

Duration: March 2007 – October 2007
Owner: Metropolitan Electricity Authority of Thailand (MEA)
Client: Siemens Limited
Location: Chidlom, BKK

This slideshow requires JavaScript.

Gas Station Redesign

Duration: March 2007 – October 2007
Owner: PTT Public Company Limited
Location: Nongchok, BKK